SME MF98-165 PDF

SME MF98-165 PDF

Name:
SME MF98-165 PDF

Published Date:
11/01/1998

Status:
Active

Description:

Elimination Of Downtime Between Coils

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
The average production line loses 20-30% of its productive day due to downtime for coil changes and rethreading. The same equipment can product 20-30% more parts in a day by adding a coil end joiner and a FLOOP (registered) to the line. In addition, continuous running means less scrap, less tool wear, and better quality of parts.
Number of Pages : 17
Published : 11/01/1998

History


Related products


Best-Selling Products