SME MM98-114 PDF

SME MM98-114 PDF

Name:
SME MM98-114 PDF

Published Date:
11/01/1998

Status:
Active

Description:

Tower Automotive Facility, Roanoke Virginia, A Fully Integrated Mes Implementation

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
Manufacturing Execution Systems (MES) are becoming recognized by many top managers for the important contributions they can make to the success of a manufacturing based business. This article describes the plant wide MES application employed at the Roanoke manufacturing facility of Tower Automotive. It is a plant wide implementation supporting a fully automated facility. This paper describes how MES assists plant management by using information technology to manage and coordinate the high volume data needs of a fully automated facility.
Number of Pages : 7
Published : 11/01/1998

History


Related products


Best-Selling Products

DRM ASME B31.3 & GUIDE SET
Published Date: 01/01/2000
ASME PROCESS PIPING / PROCESS PIPING: THE COMPLETE GUIDE TO ASME B31.3 SET (ASME B31.3 & ASME B31.3 GUIDE) - YOU SAVE 10% ***INCLUDES B31.3-2020 EDITION***
$160.5
DRM ASME B31.8 PIPING SET
Published Date: 01/01/2000
ASME GAS TRANSMISSION PIPING SET - INCLUDES ASME B31.8, ASME B31.8S, ASME B31.1, ASME B31.3 AND ASME B31.3 GUIDE - YOU SAVE 10%
$364.5
DRM DEEPWATER SET
Published Date: 01/01/2000
DEEPWATER SET INCLUDES THE FOLLOWING STANDARDS: API RP 14J, API RP 2A-WSD, API RP 2FPS, API RP 2RD, API RP 2SK, API RP 2SM, API RP 2T, API SPEC 17J, AWS D3.6M
$274.5
DRM DRM COMBO
Published Date: 01/01/2008
Drawing Requirements Manual (Hardcopy Bound & DVD)
$157.5
DRM DRM DVD
Published Date: 01/01/2008
Drawing Requirements Manual DVD
$104.7
DRM DRM
Published Date: 01/01/2008
DRAWING REQUIREMENTS MANUAL
$104.7