SME MR920372 PDF

SME MR920372 PDF

Name:
SME MR920372 PDF

Published Date:
06/01/1992

Status:
Active

Description:

Implementing A Robotic Vppa Welding System For Ssfp

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
BOEING, IN CONJUNCTION WITH MSFC, HAS ACCOMPLISHED, ON SPACE STATION FREEDOM, WHAT IS BELIEVED TO BE AN INDUSTRY FIRST BY ESTABLISHING A PRODUCTION VPPA ROBOT WORK CELL, INCORPORATING A VPPAW SYSTEM WITH EIGHT-AXES OF MOTION UNDER AUTOMATIC WELD CONTROL. VPPA WELDING OF COMPLICATED, THREE-DIMENSIONAL JOINT CONFIGURATIONS IS AN ADVANCEMENT THAT COULD FURTHER APPLICATIONS OF THE PROCESS INTO AREAS THAT WOULD OTHERWISE NOT BE CONSIDERED. THE SSFP STRUCTURE WILL BE CONSTRUCTED OF 2219 ALUMINUM USING THE COMPUTER-CONTROLLED VARIABLE POLARITY PLASMA ARC WELD (VPPAW) PROCESS. THE ROBOT-CONTROLLED SYSTEM IS PROGRAMMED TO MAINTAIN TORCH CENTER POINT (TCP) ORIENTATION PERPENDICULAR TO THE PART WHILE THE POSITIONER IS TILTED AND ROTATED TO MAINTAIN THE VERTICAL-UP ORIENTATION REQUIRED BY THE VPPAW PROCESS.
Number of Pages : 9
Published : 06/01/1992

History


Related products


Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2