SME MS900484 PDF

SME MS900484 PDF

Name:
SME MS900484 PDF

Published Date:
06/01/1990

Status:
Active

Description:

Developing Business Appropriate Material Management Systems In The

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
MANAGEMENT'S GREATEST OPPORTUNITY IN MATERIALS MANAGEMENT IS TO TURN STRATEGIC BUSINESS OBJECTIVES INTO WORKING SYSTEMS. HOWEVER, INSTALLING MATERIAL MANAGEMENT SYSTEMS (MMS) IN THE SEMICONDUCTOR INDUSTRY HAS BEEN DIFFICULT AT BEST. IN THE END, THE MATERIAL MANAGEMENT SYSTEM WILL INTERACT WITH ALMOST EVERY ASPECT OF A SEMICONDUCTOR FACILITY. AS A RESULT, THERE ARE THREE MAJOR CONSIDERATIONS THAT MUST BE ENCOURAGED: THE BUSINESS ENVIRONMENT, THE COMPUTER CONTROL SYSTEM, AND THE MATERIAL HANDLING EQUIPMENT. FROM A BUSINESS PERSPECTIVE, AS CUSTOMER DEMAND OR PROCESSING TECHNOLOGY CHANGES, THE MMS MUST BE ABLE TO ACCOMMODATE PROCESS FLOW CHANGES ALMOST INSTANTLY. FROM A COMPUTER POINT OF VIEW, THESE SYSTEMS MUST PROVIDE DATA COLLECTION CAPABILITIES, GENERATE REPORTS OF EVERY KIND, AND PROVIDE A MIGRATABLE ARCHITECTURE. AND FINALLY, FROM A MATERIAL HANDLING POINT OF VIEW, THE SYSTEM MUST TRA
Number of Pages : 11
Published : 06/01/1990

History


Related products


Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9