SME MS900745 PDF

SME MS900745 PDF

Name:
SME MS900745 PDF

Published Date:
06/01/1990

Status:
Active

Description:

Insuring Mrp Information Accuracy With Workstation Based Capp

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
MATERIAL REQUIREMENTS PLANNING (MRP) SYSTEMS REQUIRE MANY TRANSACTIONS TO MAINTAIN MANUFACTURING ENGINEERING DATA. THE GENERATION AND MAINTENANCE OF MACHINE AND TOOL DATA REQUIRES CUMBERSOME KEYBOARD EFFORTS. THIS PAPER ADDRESSES HOW, WITH WORKSTATION-BASED CAPP, MANUFACTURING ENGINEERING PLANNERS CAN USE GRAPHICAL USER INTERFACE TOOLS TO RAPIDLY PRODUCE ROUTING AND STANDARDS INFORMATION FOR MAINTAINING MATERIAL REQUIREMENTS PLANNING (MRP) SYSTEMS WHILE CREATING DETAILED MANUFACTURING INSTRUCTIONS AND DOCUMENTATION MUCH FASTER THAN BY TRADITIONAL METHODS. THE INTERFACES AND DATA FLOWS REQUIRED ARE DESCRIBED. WITH WORKSTATION-BASED CAPP, PROCESS PLANNING ENGINEERS CAN INCORPORATE GRAPHICAL SKETCHES, IMPORT CAD DRAWINGS, AND CONSULT ROUTING DISPLAY MAPS AS THEY PREPARE TOOL AND ASSEMBLY INSTRUCTIONS FOR PLANT FLOOR WORKERS.
Number of Pages : 7
Published : 06/01/1990

History


Related products


Best-Selling Products

DOT 23 CFR PART 625
Published Date: 04/01/2020
DESIGN STANDARDS FOR HIGHWAYS
$9
DOT 23 CFR PART 645
Published Date: 04/01/2019
UTILITIES
$10.8
DOT 23 CFR PART 655
Published Date: 04/01/2018
TRAFFIC OPERATIONS
$9.3
DOT 33 CFR PART 127
Published Date: 07/01/2019
WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS
$11.7
DOT 33 CFR PART 154
Published Date: 07/01/2017
FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
$18.3
DOT 33 CFR PART 154
Published Date: 07/01/2019
FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
$18.3