SME MS900804 PDF

SME MS900804 PDF

Name:
SME MS900804 PDF

Published Date:
06/01/1990

Status:
Active

Description:

Justification For Flexible Assembly Automation

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
MANY COMPANIES SEEM UNSURE HOW TO APPROACH THE JUSTIFICATION OF ASSEMBLY AUTOMATION. FOR MOST PRODUCTS, DIRECT LABOR IS LESS THAN 10% OF PRODUCT COST AND MANAGEMENT VIEWS THIS NUMBER AS TOO SMALL TO JUSTIFY THE TIME AND CAPITAL EXPENSE ASSOCIATED WITH AUTOMATION. EVEN IMPROVEMENTS IN QUALITY ARE OFTEN NOT ENOUGH TO JUSTIFY AUTOMATION. HOWEVER, WHEN AUTOMATION IS ANALYZED AS A MEANS TO IMPROVE PLANT CAPACITY, THE ANALYSIS IS MUCH MORE FAVORABLE. OFTEN 30 TO 40% OF A PRODUCT'S COST IS ASSOCIATED WITH MANUFACTURING OVERHEAD. INCREASING PLANT CAPACITY CAN DECREASE THE PER UNIT COST OF MANUFACTURING OVERHEAD. AN EXAMPLE OF THIS TYPE OF ANALYSIS IS GIVEN. A CASE STUDY WHERE UNIT COSTS WERE REDUCED 40% IS PRESENTED. FLEXIBLE AUTOMATION IS CONTRASTED WITH FIXED AUTOMATION AND THE CONCEPT OF ADDING CAPACITY IN SMALL INCREMENTS AS VOLUME GROWS IS INTRODUCED.
Number of Pages : 6
Published : 06/01/1990

History


Related products


Best-Selling Products

ALSC PS 20
Published Date: 10/01/2021
American Softwood Lumber Standard
ALSC PS 20
Published Date: 01/01/2005
American Softwood Lumber Standard
ALSC PS 20
Published Date: 06/01/2010
American Softwood Lumber Standard