SME MS910387 PDF

SME MS910387 PDF

Name:
SME MS910387 PDF

Published Date:
06/01/1991

Status:
Active

Description:

Automatic Precedence Plan Generation With Spatial Relationships In Assembly

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
PRECEDENCE RELATIONSHIP GENERATION IS A CLASS OF PROBLEM WHICH IS CRUCIAL IN THE GENERATION OF MANUFACTURING OPERATION PLAN. THIS PAPER PRESENTS AN ALGORITHM TO DETERMINE THE PRECEDENCE RELATIONSHIPS IN TIME IN A MULTI- ITEM ASSEMBLY. GEOMETRIC CONSTRAINTS IN TERMS OF SPATIAL RELATIONSHIPS OF THE PARTS WITH RESPECT TO EACH OTHER DETERMINE THIS PRECEDENCE IN RELATIONSHIPS. SINGLE ROBOT WORKCELLS ARE ASSUMED AT PRESENT FOR THE ALGORITHM AND IT IS ALSO ASSUMED THAT THE ASSEMBLY OPERATIONS CAN BE PERFORMED BY THIS ROBOT. ALL SUBASSEMBLIES ARE CONSIDERED DESIGNED TO BE STABLE AND MAINTAIN THEIR SPATIAL RELATIONSHIPS AT ANY POINT IN TIME. A GRAPH-BASED APPROACH IS EMPLOYED TO DEAL WITH THE PROBLEM OF ASSEMBLY PLAN GENERATION. THE COMPONENT PARTS OF THE ASSEMBLY ARE STORED AS NODES IN THE COMPONENT CONNECTIVITY GRAPH AND THE PRECEDENCE RELATIONS BETWEEN THESE PARTS ARE STORED AS A DIRECTED ASS
Number of Pages : 16
Published : 06/01/1991

History


Related products


Best-Selling Products

SNV RFC 7723
Published Date: 01/01/2016
Port Control Protocol (PCP) Anycast Addresses
$9.6
SNV SIA 196*SN 531196
Published Date: 11/01/1998
Baulueftung im Untertagbau
$44.7
SNV SIA 196
Published Date: 11/01/1998
Ventilation des chantiers souterrains
$44.7
SNV SIA 197/1*SN 505197/1
Published Date: 10/01/2004
Projektierung Tunnel Bahntunnel
$38.4
SNV SIA 197/2*SN 505197/2
Published Date: 10/01/2004
Projektierung Tunnel Strassentunnel
$38.4
SNV SIA 197*SN 505197
Published Date: 10/01/2004
Projektierung Tunnel Grundlagen
$41.1