SME MS930256 PDF

SME MS930256 PDF

Name:
SME MS930256 PDF

Published Date:
06/01/1993

Status:
Active

Description:

Front End Shop Floor Control In A Remanufacturing Area

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
sme-ms930256_920932

Choose Document Language:
0
Need Help?
CRITICAL TO THE SUCCESS OF A REMANUFACTURING ENVIRONMENT IS AN UNDERSTANDING OF THE ROLE FRONT END INVENTORY PLAYS IN SUPPORTING THE OVERALL REMANUFACTURING PROCESS. THE FRONT END OF REMANUFACTURING IS DEFINED TO INCLUDE CORE RECEIVING, INSPECTION, DISASSEMBLY, AND RECLAMATION. THIS PAPER FOCUSES ON THE TRADE-OFFS ASSOCIATED WITH DETERMINING THE APPROPRIATE TYPE OF FRONT END INVENTORY TO SUPPORT THE OVERALL MANUFACTURING PROCESS.
Number of Pages : 7
Published : 06/01/1993

History


Related products


Best-Selling Products

EI IP-MCSP-P19
Published Date: 2012
Model Code of Safe Practice Part 19: Fire precautions at petroleum refineries and bulk storage installations, Third Edition
87.63 €