SME MS94-199 PDF

SME MS94-199 PDF

Name:
SME MS94-199 PDF

Published Date:
06/01/1994

Status:
Active

Description:

Sequencing Single-Gripper Gantry Robots In Tightly-Coupled Automated Serial Production

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
THIS PAPER DEALS WITH THE PROBLEM OF SCHEDULING SINGLE-GLRIPPER GANTRY ROBOTS IN A TIGHTLY-COUPLED AUTOMATED SERIAL PRODUCTION LINE WITH DETERMINISTIC PROCESSING TIME. AN OPTIMAL SCHEDULE IS PRESENTED FIRST BY ANALYZING THE CYCLE TIME FORMULA FOR TWO- AND THREE-WORKSTATION (m=2, AND 3) PRODUCTION LINES. THEN THE RESULT IS EXTENDED TO THE PROBLEM OF SCHEDULING A PRODUCTION LINE WITH m>3 WORKSTATIONS AND AN OPTIMAL SCHEDULE IS DEVELOPED. THIS STUDY PROVIDED VALUABLE INSIGHTS FOR THE DESIGN AND SCHEDULINE OF PRODUCTION SYSTEMS USING SIMILAR MATERIAL HANDLING MECHANISMS.
Number of Pages : 14
Published : 06/01/1994

History


Related products


Best-Selling Products

NIRMA CM 1.0-2007
Published Date: 01/01/2000
American National Standard for Guidelines for Configuration Management of Nuclear Facilities