SME PE930167 PDF

SME PE930167 PDF

Name:
SME PE930167 PDF

Published Date:
06/01/1993

Status:
Active

Description:

Case Studies In Rapid Prototyping At Sundstrand Electric Power Systems

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
SUNDSTRAND ELECTRIC POWER SYSTEMS IN LIMA, OHIO IS USING 3-D SOLID MODELING AND VARIOUS RAPID PROTOTYPING TECHNOLOGIES TO ENHANCE THE IMPLEMENTATION OF INTEGRATED PRODUCT AND PROCESS DEVELOPMENT (IPPD), MORE COMMONLY KNOWN AS CONCURRENT ENGINEERING. PROJECT DESIGN/BUILD TEAMS RAPID PROTOTYPE KEY COMPONENTS SUCH AS COMPLEX INVESTMENT CASTINGS TO VERIFY FORM, FIT AND FUNCTION USING STEREOLITHOGRAPHY, SELECTIVE LASER SINTERING, OR OTHER APPROPRIATE PROCESSES. NUMERICAL CONTROL MACHINE TOOLS DEVELOP MILLED OR TURNED PARTS FROM THE SOLID MODEL DATABASE AND SUPPLIERS ARE INCLUDED IN THE DESIGN AND DEVELOPMENT PROCESS AS PARTNERS TO PROVIDE DESIGN INPUTS THUS AVOIDING COSTLY MANUFACTURING ERRORS. THE DESIGN/BUILD TEAMS ALSO PRODUCE ENGINEERING VERIFICATION TEST PARTS VIA RAPID PROTOTYPING TECHNIQUES. THIS PAPER REVIEWS SPECIFIC CASE STUDIES WHERE RAPID PROTOTYPING TECHNOLOGIES WERE USED ON T
Number of Pages : 23
Published : 06/01/1993

History


Related products


Best-Selling Products

TFF 100/107
Published Date: 2002
TEST
TFF 108
Published Date: 1993
TEST
TFF 109/510
Published Date: 1999
TEST
TFF 110
Published Date: 12/20/1986
TEST
TFF 110
Published Date: 2003
TEST
TFF 111
Published Date: 2002
TEST