SME TE910144 PDF

SME TE910144 PDF

Name:
SME TE910144 PDF

Published Date:
06/01/1991

Status:
Active

Description:

Quick Change Tooling For Today...And Tomorrow

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
MACHINE TOOL PRODUCTIVITY IS GREATLY ENHANCED BY SHARPLY REDUCING SETUP TIME FOR WORKHOLDING AND TOOLING. SIGNIFICANT TIME SAVINGS CAN BE ACHIEVED IN SHORT, MEDIUM, AND LONG-RANGE PRODUCTION RUNS WITH THE USE OF PRESET, OFF-LINE TOOLING THAT REDUCES TRAIL CUTS, SCRAP PARTS, AND ASSURES BLUEPRINT ACCURACY. NOW, THERE ARE IN-PLACE QUICK CHANGE TOOLING SYSTEMS AVAILABLE FOR THE COMPLEX MANUFACTURING REQUIREMENTS OF TODAY AND IN THE FUTURE. BOTH TURNING AND GRINDING CASE HISTORIES--AND THE RESULTS ACHIEVED--DETAIL INCREASED MANUFACTURING UPTIME, PRECISION REPEATABILITY TOLERANCES TO .0001 IN. (0.003MM), AND REDUCED NONPRODUCTIVE DOWNTIME.
Number of Pages : 13
Published : 06/01/1991

History


Related products


Best-Selling Products

Cavitation
Published Date: 09/01/1999
$15.6