SME TE930150 PDF

SME TE930150 PDF

Name:
SME TE930150 PDF

Published Date:
06/01/1993

Status:
Active

Description:

Reducing Setup Time On Cnc Machines

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
sme-te930150_921148

Choose Document Language:
0
Need Help?
IN THE AGE OF JIT (JUST IN TIME) PRODUCTION, QUICK JOB CHANGEOVER IS VERY ESSENTIAL TO MEET THE GOALS OF SMALL LOT CUSTOMIZED PIECE PRODUCTION. IN MACHINE SHOP TERMINOLOGY, THIS TRANSLATES TO SAYING THAT THE SETUP TIME SHOULD BE REDUCED. THIS PAPER ANALYZES SETUP TIME AS IT RELATES TO CNC TURNING CENTERS AND MACHINING CENTERS. IT ALSO POINTS OUT TO THE DEGREE OF HUMAN SKILL REQUIRED FOR DOING THE SETUP, EVEN WITH CNC MACHINES. IT THEN DETAILS THE FEATURES THAT ARE BUILT IN THE MACHINES AND CONTROLS, USING EXISTING TECHNOLOGIES, TO REDUCE THE SETUP TIME AS WELL AS THE DEGREE OF HUMAN SKILL REQUIRED TO DO THE SETUP.
Number of Pages : 27
Published : 06/01/1993

History


Related products


Best-Selling Products

ABS 1 PART 7
Published Date: 07/01/2022
Rules for Survey After Construction Part 7
ABS 109 PART 3
Published Date: 01/01/2023
Rules for Building and Classing Light Warships, Patrol and High-Speed Naval Vessels Part 3 Hull Construction and Equipment
ABS 151
Published Date: 09/01/2021
Guide for Vessels Operating In Low Temperature Environments
ABS 151
Published Date: 01/01/2024
Guide for Vessels Operating In Low Temperature Environments
ABS 151
Published Date: 01/01/2015
GUIDE FOR VESSELS OPERATING IN LOW TEMPERATURE ENVIRONMENTS
7.20 €
ABS 158
Published Date: 10/01/2018
GUIDE FOR THE INVENTORY OF HAZARDOUS MATERIALS
6.00 €