SME TE930150 PDF

SME TE930150 PDF

Name:
SME TE930150 PDF

Published Date:
06/01/1993

Status:
Active

Description:

Reducing Setup Time On Cnc Machines

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
IN THE AGE OF JIT (JUST IN TIME) PRODUCTION, QUICK JOB CHANGEOVER IS VERY ESSENTIAL TO MEET THE GOALS OF SMALL LOT CUSTOMIZED PIECE PRODUCTION. IN MACHINE SHOP TERMINOLOGY, THIS TRANSLATES TO SAYING THAT THE SETUP TIME SHOULD BE REDUCED. THIS PAPER ANALYZES SETUP TIME AS IT RELATES TO CNC TURNING CENTERS AND MACHINING CENTERS. IT ALSO POINTS OUT TO THE DEGREE OF HUMAN SKILL REQUIRED FOR DOING THE SETUP, EVEN WITH CNC MACHINES. IT THEN DETAILS THE FEATURES THAT ARE BUILT IN THE MACHINES AND CONTROLS, USING EXISTING TECHNOLOGIES, TO REDUCE THE SETUP TIME AS WELL AS THE DEGREE OF HUMAN SKILL REQUIRED TO DO THE SETUP.
Number of Pages : 27
Published : 06/01/1993

History


Related products


Best-Selling Products

EPA 40 CFR PART 112
Published Date: 07/01/2019
OIL POLLUTION PREVENTION
$19.5
EPA 40 CFR PART 112
Published Date: 07/01/2018
OIL POLLUTION PREVENTION
$19.5
EPA 40 CFR PART 112
Published Date: 07/01/2023
OIL POLLUTION PREVENTION
$19.2
EPA 40 CFR PART 112
Published Date: 07/01/2020
OIL POLLUTION PREVENTION
$19.2
EPA 40 CFR PART 112
Published Date: 07/01/2021
OIL POLLUTION PREVENTION
$19.2
EPA 40 CFR PART 122
Published Date: 07/01/2018
EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
$20.4