AS/NZS 2804.1:1995 PDF

AS/NZS 2804.1:1995 PDF

Name:
AS/NZS 2804.1:1995 PDF

Published Date:
11/05/1995

Status:
[ Superseded ]

Description:

Installation of security screen doors, Part 1: Hinged

Publisher:
Standards Australia / Standards New Zealand

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$8.316
Need Help?
Sets out requirements for the installation of hinged, security screen doors as specified in AS/NZS 2803.1. It applies to doors primarily used in residential applications.
Edition : 1st
File Size : 1 file , 66 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 5
Product Code(s) : 10171888, 10171903, 10171883
Published : 11/05/1995

History

AS/NZS 4605:1999
Published Date: 09/05/1999
Installation of security window grilles
$10.89
AS/NZS 2804.2:1996
Published Date: 10/05/1996
Installation of security screen doors, Part 2: Sliding
$4.95
AS/NZS 2804.1:1995
Published Date: 11/05/1995
Installation of security screen doors, Part 1: Hinged
$8.316

Related products

AS/NZS 3750.14:1997
Published Date: 11/05/1997
Paints for steel structures, Part 14: High-build epoxy (two-pack)
$21.582
AS/NZS 4266.1:2017
Published Date: 12/13/2017
Reconstituted wood-based panels - Methods of testing, Part 1: Base panels
$37.026
AS/NZS ISO/IEC 20000.3:2020
Published Date: 05/15/2020
Information technology - Service management, Part 3: Guidance on scope definition and applicability of AS/NZS ISO/IEC 20000.1
$30.492
AS/NZS 2276.3:2002
Published Date: 05/30/2002
Cables for traffic signal installations, Part 3: Loop cable for vehicle detectors
$10.89

Best-Selling Products

ARMY 03101
Published Date: 12/01/1992
FORMWORK FOR CONCRETE
$9.6
ARMY ADS-37A-PRF
Published Date: 05/28/1996
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS (E3) PERFORMANCE AND VERIFICATION REQUIREMENTS
$14.7
ARMY AMC P 715-17
Published Date: 03/15/1994
GUIDE FOR THE PREPARATION AND USE OF PERFORMANCE SPECIFICATIONS
$23.4
ARMY AR 1-100
Published Date: 07/27/2015
The Army Gift Program
$11.7
ARMY AR 1-15
Published Date: 01/31/2017
Civilian Aides to the Secretary of the Army
$10.2
ARMY AR 1-1
Published Date: 05/23/2016
Planning, Programming, Budgeting, and Execution
$14.1