SN-CEN/TR 15642:2008 PDF

SN-CEN/TR 15642:2008 PDF

Name:
SN-CEN/TR 15642:2008 PDF

Published Date:
01/23/2008

Status:
Active

Description:

Unified tests procedures for the tests of EN 3-7

Publisher:
Standards Norway SN-CEN/TR Series

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
sn-cen-tr-15642-2008_2548501

Choose Document Language:
0
Need Help?
ADOPTED_FROM:CEN/TR 15642:2008 This procedure is applicable to: 2.1 The powder extinguishers for testing, before the 24 h storage period at (20 ± 5)°C prior to the following tests: - the duration of operation tests; - the control valve tests; - the fire performance tests. 2.2 The water based extinguishers for testing, before the 24 h storage period at (20 ± 5)°C prior to: - the duration of operation tests.
Number of Pages : 24
Published : 01/23/2008

History

SN-CEN/TR 15642:2011
Published Date: 03/16/2011
Unified tests procedures for the tests of EN 3-7:2004+A1:2007
SN-CEN/TR 15642:2008
Published Date: 01/23/2008
Unified tests procedures for the tests of EN 3-7

Related products


Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2