TAPPI TIP 0304-66 PDF

TAPPI TIP 0304-66 PDF

Name:
TAPPI TIP 0304-66 PDF

Published Date:
05/01/2002

Status:
Active

Description:

The Impact of Doublebacker Hot Plate Level on Board Quality and How to Measure It

Publisher:
Technical Association of the Pulp and Paper Industry

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
Hot plates in the doublebacker (DB) section must be maintained so that the leading edge of any plate is level with or slightly lower than the trailing edge of the preceding plate. The consequences of a leading edge plate that is higher than the previous plates trailing edge can be: Flutes crushed as the hot board runs into and rides over a high lead edge. This can negatively affect caliper and box compression. Disturbance of the DB glue line can occur, especially if the high leading edge is early in the hot plate section when the glue line is still in the early stages of bonding. This can cause weakened bond and delamination.
Number of Pages : 3
Published : 05/01/2002

History

TAPPI TIP 0304-66
Published Date: 2023
The Impact of Doublebacker Hot Plate Level on Board Quality and How to Measure It
$14.7
TAPPI TIP 0304-66
Published Date: 2012
The Impact of Doublebacker Hot Plate Level on Board Quality and How to Measure It
$14.7
TAPPI TIP 0304-66
Published Date: 01/01/2008
The Impact of Doublebacker Hot Plate Level on Board Quality and How to Measure It
TAPPI TIP 0304-66
Published Date: 05/01/2002
The Impact of Doublebacker Hot Plate Level on Board Quality and How to Measure It

Related products

TAPPI TIP 0304-30
Published Date: 07/30/2021
Use, Calibration and Maintenance of the Manually Operated Paper Micrometers
$14.7
TAPPI UM 822
Published Date: 2012
Green Peel Bond Procedure at the Corrugator
$14.7
TAPPI TIP 0304-32
Published Date: 09/01/2024
Causes and Corrections of Common Corrugator Bonding Problems
$14.7

Best-Selling Products

2005 AASHTO Reference Book
Published Date: 01/01/2005
2011 AASHTO Reference Book
Published Date: 2011
AASHTO AAB-1
Published Date: 01/01/2008
Above and Beyond
Free Download
AASHTO ABC-1
Published Date: 2018
LRFD Guide Specifications for Accelerated Bridge Construction, 1st Edition
$81
AASHTO ADM-1
Published Date: 2014
Drainage Manual
AASHTO AGIP-1
Published Date: 08/19/2024
AASHTO Guide for Interlocking Pavements, 1st Edition
$56.7