TAPPI TIP 0416-22 PDF

TAPPI TIP 0416-22 PDF

Name:
TAPPI TIP 0416-22 PDF

Published Date:
01/01/2009

Status:
Active

Description:

Guidelines for operating and maintenance practices impacting an economizer on a recovery boiler

Publisher:
Technical Association of the Pulp and Paper Industry

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$14.7
Need Help?
The economizer installed on a recovery boiler is the component responsible for the greatest number of tube leaks that result in lost production for the pulp and paper industry. This technical information paper is based on a comprehensive study initiated by the AF&PA Recovery Boiler Committee (1). A condensation of the report was presented at a TAPPI Conference in 2006 (2). The study determined primary causes of economizer tube damage are stress or fatigue cracks, poor quality welds, internal and external corrosion and thinning, and mechanical design. The knowledge of failure mechanisms was applied to relate operating and maintenance practices that could contribute to failures and then apply these in a review of economizer failure incidents to seek confirmation of practices detrimental to economizer integrity. These guidelines are a summary of those analyses.
File Size : 1 file , 68 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 01/01/2009

History


Related products


Best-Selling Products

CS UK CAS01
Published Date: 01/01/2003
The provision of holes in reinforced concrete beams
$7.5
CS UK CAS02
Published Date: 01/01/2014
Suspended concrete floors: maximum size of pour allowable and location of construction joints
$6
CS UK CAS03
Published Date: 02/01/2014
Straightening and rebending reinforcement on site
$6
CS UK CAS04
Published Date: 01/01/2014
Congested reinforcement: effects on placing and compacting concrete
$6
CS UK CAS05
Published Date: 04/01/2014
Holding down bolts in concrete: Suggested design procedures to BS 8110-1
$7.5
CS UK CAS06
Published Date: 01/01/2003
Reinforcement ripple
$7.5