TIA ANSI/TIA-102.AACC-A PDF

TIA ANSI/TIA-102.AACC-A PDF

Name:
TIA ANSI/TIA-102.AACC-A PDF

Published Date:
08/08/2006

Status:
[ Active ]

Description:

Project 25 - Conformance Tests for Project 25 Over-The-Air Rekeying (OTAR) Protocol

Publisher:
Telecommunications Industry Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$63.6
Need Help?
ALSO SEE TIA/EIA 102 SERIES * ANSI APPROVED

This document provides a series of conformance tests for the Project 25 Over-The- Air-Rekeying (OTAR) Protocol, reference 1. These tests are intended to assure that the equipment conforms to the message formats specified in the OTAR Protocol document. This is a first step (necessary but not sufficient) for interoperability with other equipment conforming to the standard. These tests provide for the encryption of keys and the generation of the Message Authentication Code (MAC) that may be part of a Key Management Message (KMM). The tests generating KMM data messages, that may contain encrypted keys and/or a MAC, will not perform the outer layer encryption (the encryption of the data message with a traffic key). The output of these tests will generate a file containing plain text data message(s) suitable to be encrypted by the programs provided in the Conformance Test for the Project 25 DES Encryption Protocol, reference 2.

The reader is advised that OTAR uses Project 25 data messages. As a result, it may be part of a larger data service and relevant TIA/EIA Data documents should be consulted for any necessary protocols such as data registration and data affiliation.

These conformance tests are intended to verify that KMMs produced by equipment are correctly generated, that keys contained within these KMMs are properly encrypted, and that the Message Authentication Code (MAC) is correctly computed, all in accordance with the Project 25 Over-The-Air-Rekeying (OTAR) Protocol. The tests also verify that the equipment receiving KMMs properly parses the KMMs, any encrypted keys received are correctly decrypted, and MACs are correctly computed at the receiver. The OTAR conformance tests do not verify compliance to the DES Encryption Protocol, reference 3, or to the Recommended Common Air Interface (CAI), reference 4.

The encryption of keys and the generation of the MAC per this conformance test are not intended to verify compliance with the DES standard, given in references 5 and 6. Tests for compliance to the DES standard exist, such as in reference 7. These tests should be done as a prerequisite to the conformance tests described in this document.

These tests are to be applied by a manufacturer of a product implementation to verify that it conforms to the Project 25 Over-The-Air-Rekeying (OTAR) Protocol. These tests apply to radio products, particularly portable and mobile radios and fixed equipment that includes key management functions. Some of the tests are designed to apply to equipment generating the KMMs, while other tests are designed to apply to the receiver of the KMMs.

These tests are different and distinct from performance tests, given in references 8 and 9, that measure the actual limits of equipment performance. The performance and conformance tests are mutually complementary. These tests are also different and distinct from lock down tests, which are intended to demonstrate interoperability between different radios. These conformance tests are intended to precede lock down tests.


ANSI : ANSI Approved
Edition : A
File Size : 1 file , 3.5 MB
Number of Pages : 118
Published : 08/08/2006

History

TIA ANSI/TIA-102.AACC-A
Published Date: 08/08/2006
Project 25 - Conformance Tests for Project 25 Over-The-Air Rekeying (OTAR) Protocol
$63.6
TIA ANSI/TIA/EIA-102.AACC
Published Date: 06/13/2002
Conformance Tests for the Project 25 Over-The-Air Rekeying (OTAR) Protocol
$74.7

Related products

TIA ANSI/TIA-102.AABF-D
Published Date: 02/24/2015
Project 25 Link Control Word Formats and Messages
$36.9
TIA TIA-102.CAAA-F
Published Date: 09/01/2021
Project 25 Digital C4FM/CQPSK Transceiver Measurement Methods
$89.4
TIA TIA-102.AACE-A
Published Date: 04/01/2011
Project 25 Digital Land Mobile Radio Link Layer Authentication
$35.7
TIA ANSI/TIA/EIA-102.BABC
Published Date: 04/01/1999
Project 25 Vocoder Reference Test
$32.7

Best-Selling Products

CID A-A-002544 Notice 1 - Cancellation
Published Date: 10/14/1999
COATING, RUST PREVENTIVE FOR INACTIVE FLEET SHIPS (NO S/S DOCUMENT)
$7.2
CID A-A-002544
Published Date: 04/23/1987
COATING, RUST PREVENTIVE FOR INACTIVE FLEET SHIPS (NO S/S DOCUMENT)
$7.2
CID A-A-0030112 Notice 1 - Cancellation
Published Date: 02/28/1992
BRUSH-SPONGE, SURGICAL SCRUB (NO S/S DOCUMENT)
$7.2
CID A-A-0030120 Notice 1 - Cancellation
Published Date: 01/08/1993
SPONGE, SURGICAL (NO S/S DOCUMENT)
$7.2
CID A-A-0030120
Published Date: 01/08/1987
SPONGE, SURGICAL (NO S/S DOCUMENT)
$7.2
CID A-A-0030123 Notice 1 - Cancellation
Published Date: 07/15/1992
KNIFE, GENERAL SURGICAL (NO S/S DOCUMENT)
$7.2