TIA TIA-4945 PDF

TIA TIA-4945 PDF

Name:
TIA TIA-4945 PDF

Published Date:
08/01/2012

Status:
[ Revised ]

Description:

Dynamic RAN Power Management Stage 1 Requirements

Publisher:
Telecommunications Industry Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.1
Need Help?

This document provides the requirements for Dynamic RAN Power Management (DRPM). DRPM allows operators to control the power usage of RAN equipment dynamically. Such control includes powering off RAN equipment in times of low traffic, powering on RAN equipment in times of high traffic, consideration for emergency services, response to equipment failure, and scheduling of power management activities.


Edition : 12
File Size : 1 file , 3.8 MB
Number of Pages : 16
Published : 08/01/2012

History

TIA TIA-4945-A
Published Date: 04/01/2013
Dynamic RAN Power Management Stage 1 Requirements
$23.1
TIA TIA-4945
Published Date: 08/01/2012
Dynamic RAN Power Management Stage 1 Requirements
$23.1

Related products

TIA ANSI/TIA/EIA-96-C
Published Date: 08/01/1998
Speech Service Option Standard for Wideband Spread Spectrum Systems
$55.2
TIA TIA-2000.4-F-1
Published Date: 06/01/2014
Signaling Link Access Control (LAC) Standard for cdma2000 Spread Spectrum Systems
$111.3
TIA ANSI/TIA-124-E
Published Date: 11/09/2006
Wireless Radio Telecommunication Intersystem Non-Signaling Data Communication DHM (Data Message Handler)
$160.2
TIA TIA-1165.000-A
Published Date: 04/01/2012
cdma2000 Femtocell Network: Overview
$32.1

Best-Selling Products