UL 508A PDF

UL 508A PDF

Name:
UL 508A PDF

Published Date:
04/24/2018

Status:
Active

Description:

Industrial Control Panels

Publisher:
Underwriters Laboratories

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$269.1
Need Help?
Please note: All interim revisions for this edition available at time of your purchase will be included.

This New Edition of UL 508A includes the following changes in requirements:

Interlocking means to prevent restoring power

Marking of Overload Setting

SB4.3.1 correction

Redefining the definition of Low Voltage

Cable Assemblies and Fittings for Power and Control Circuits

SB4.2.3 Exception No. 4 - Substituting for a Non-Current Limiting Overcurrent Device

Add 6P as an additional device that may be used to close an opening in a Type 4X enclosure in UL 508A, Table 19.2
Edition : 3
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 04/24/2018

History

UL 508A
Published Date: 04/24/2018
Industrial Control Panels
$269.1
UL 508A
Published Date: 12/20/2013
Industrial Control Panels
UL 508A
Published Date: 01/01/2001
Industrial Control Panels

Related products


Best-Selling Products

FM Approvals 1011/1012/1013:2020
Published Date: 12/01/2020
Examination Standard for Deluge and Preaction Sprinkler Systems
$15
FM Approvals 1011/1012/1013
Published Date: 09/01/2009
Deluge and Preaction Sprinkler Systems
$15
FM Approvals 1020:2020
Published Date: 12/01/2020
Examination Standard for Automatic Water Control Valves
$15
FM Approvals 1020
Published Date: 04/01/2007
Automatic Water Control Valves
$15
FM Approvals 1021:2020
Published Date: 12/01/2020
Dry Pipe Valves
$15
FM Approvals 1021
Published Date: 11/01/1973
Dry Pipe Valves
$15