UOP 6-82 PDF

UOP 6-82 PDF

Name:
UOP 6-82 PDF

Published Date:
01/01/1982

Status:
[ Withdrawn ]

Description:

Induction Period of Gasolines Using the UOP Oxygen Pressure Vessel

Publisher:
UOP LLC, A Honeywell Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$86.1
Need Help?

This method is for determining the induction period of gasolines. It is useful as a control test and will show responses of gasolines to inhibitors. The method does not give the same numerical induction periods as ASTM Method D 525 because of differences in construction of the pressure vessel, the amount of oxygen in the pressure vessel, heat transfer, surface area of gasoline to be oxidized, the sample volume, and the type of bath used to heat the vessel. The results, however, are parallel but may be somewhat higher and this method is faster and more convenient to perform.


File Size : 1 file , 210 KB
Number of Pages : 6
Published : 01/01/1982

History


Related products

UOP 296-82
Published Date: 01/01/1982
Arsenic in Petroleum Naphthas
$86.1
UOP 851-08
Published Date: 08/19/2008
Density of Powders and Solids by Helium Displacement
$72
UOP 699-09
Published Date: 06/01/2009
Sodium in Liquefied Petroleum Gas by ICP-OES or AAS
$72
UOP 948-07
Published Date: 05/31/2007
Relative Density of Gas Mixtures by Calculation From Composition
$72

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9