Liquidated Damages and Extensions of Time: In Construction Contracts, 3rd Edition PDF

Liquidated Damages and Extensions of Time: In Construction Contracts, 3rd Edition PDF

Name:
Liquidated Damages and Extensions of Time: In Construction Contracts, 3rd Edition PDF

Published Date:
01/01/2009

Status:
Active

Description:

Publisher:
John Wiley and Sons

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?

Liquidated damages and extensions of time are complex subjects, frequently forming the basis of contract claims made under the standard building and civil engineering contracts. Previous editions of Liquidated Damages and Extensions of Time are highly regarded as a guide for both construction industry professionals and lawyers to this complex area.

The law on time and damages continues to develop with an increasing flow of judgments from the courts. Alongside this, the standard forms of contract have also developed over time to reflect prevailing approaches to contractual relationships. Against this background a third edition will be welcomed by construction professionals and lawyers alike. Retaining the overall approach of the previous editions, the author clarifies, in a highly readable but legally rigorous way, the many misunderstandings on time and damages which abound in the construction industry. The third edition takes account of a large volume of new case law since the previous edition was published over ten years ago, includes a new chapter on delay analysis and features significantly expanded chapters on penalty clauses, the effects of conditions precedent and time-bars, and the complexities of causation.


ISBN(s) : 9781405118156
Published : 01/01/2009

History


Related products


Best-Selling Products

JSSG JSSG-2000B Notice 1 - Validation
Published Date: 08/21/2009
Air System
$3.6
JSSG JSSG-2000B Notice 2 - Validation
Published Date: 08/06/2014
Air System
$3.6
JSSG JSSG-2001A
Published Date: 10/22/2002
Air Vehicle
$35.7
JSSG JSSG-2001B Notice 1 - Validation 1
Published Date: 01/29/2009
Air Vehicle
$3.6
JSSG JSSG-2001B Notice 2 - Validation 2
Published Date: 12/03/2013
Air Vehicle
$3.6
JSSG JSSG-2001B Notice 3 - Validation 3
Published Date: 09/12/2018
Air Vehicle
$3.6