WRC 408 PDF

WRC 408 PDF

Name:
WRC 408 PDF

Published Date:
1996

Status:
Active

Description:

Bolted Flange Assembly: Preliminary Elastic Interaction Data and Improved Bolt-Up Procedures

Publisher:
Welding Research Council, Inc.

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
wrc-408_2190071

Choose Document Language:
38.10 €
Need Help?
Design bolt loading in a bolted flange connection is difficult to obtain because of elastic interaction. Elastic interaction data is presented for two different pipe flanges, three different gasket styles and two different bolting patterns. An algorithm that compensates for elastic interaction is given. Uniform bolt preload (±2%) is obtained in a single pass bolt-up operation. The algorithm is based on experimentally obtained interaction coefficients.
File Size : 1 file , 3.2 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 35
Published : 1996

History


Related products

WRC 130
Published Date: 1968
Advances in Fracture Toughness characterization Procedures and in Quantitative Interpretations to Fracture-Safe Design for Structural Steels
21.60 €
WRC 509
Published Date: 2006
Weldability and Hot Ductility Behavior of Nuclear Grade Austenitic Stainless Steels
99.00 €
WRC Volume 56 No. 09-10 2001
Published Date: 2001
Progress Reports Volume 56 No. 09-10 2001
28.50 €
WRC Volume 62 No. 03-04 2007
Published Date: 2007
Progress Reports Volume 62 No. 03-04 2007
28.50 €

Best-Selling Products

PDI BPSGI
Published Date:
Basic Principles for Sizing Grease Interceptors
PDI G 101
Published Date: 03/01/2010
Testing and Rating Procedure for Hydro Mechanical Grease Interceptors with Appendix of Installation and Maintenance
PDI G 102
Published Date:
Testing and Certification for Grease Interceptors with FOG Sensing and Alarm Devices
PDI GGI-EM
Published Date: 01/01/2010
Guide To Grease Interceptors: Eliminating the Mystery
PDI MGO
Published Date:
Model Grease Ordinance
PDI MSREPFS
Published Date: 01/01/2009
MINIMUMSPACE REQUIREMENTS FOR ENCLOSED PLUMBING FIXTURE SUPPORTS