WRC Volume 49 No. 05-06 1994 PDF

WRC Volume 49 No. 05-06 1994 PDF

Name:
WRC Volume 49 No. 05-06 1994 PDF

Published Date:
1994

Status:
Active

Description:

Progress Reports Volume 49 No. 05-06 1994

Publisher:
Welding Research Council, Inc.

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
wrc-volume-49-no-05-06-1994_2190755

Choose Document Language:
28.50 €
Need Help?

CONTENTS

This volume includes the full Minutes of the Executive Committee and the Design Division. The balance of the PVRC Minutes, including those of the PVRC Materials and Fabrication Division, appear in teh companion volume, July/August 1994 Progress Reports.

- Executive Committee, February 2, 1994
- JPVRC Progress Reports
- PVRC Operating Procedures
- PVRC By-Laws
- Fatigue Coordinating Committee, January 31, 1994
- Task Group on Continuing Operation of Equipment, January 31, 1994
- Design Division, February 2, 1994
- Committee on Bolted Flanged Connections, February 1, 1994
- Subcommittee on Gasket Testing and Elevated Temperature Flanged Joint Behavior, January 31, 1994
- Subcommittee on Flanges Parameter Study, January 31, 1994
- Task Group on Valve Stem Emissions, February 1, 1994
- Information Exchange Meeting on Gasket Testing, Part 1 and 2, January 31, 1994
- Committee on Dynamic Analysis and Testing, February 1, 1994
- Subcommittee on Dynamic Stress Criteria, February 1, 1994
- Committee on Elevated Temperature Design, February 1, 1994
- Committee on Piping and Nozzles, January 31, 1994
- Subcommittee on Flexibility Models and Stress Intensification Factors, January 31, 1994
- Subcommittee on Long Range Planning, January 31, 1994
- Subcommittee on Shell Intersections, January 31, 1994
- Task Group on Large Diameter Shell Intersections, January 31, 1994
- Committee on Polymers for Pressure Components, February 1, 1994
- Committee on Shells and Ligaments, January 31, 1994
- Alphabetical Listing of Pressure Vessel Research Council Members


File Size : 1 file , 4.2 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 122
Published : 1994

History


Related products

WRC 108
Published Date: 1965
Part 1: Experimental Determination of Stress Distributions in Thin-Walled Cylindrical and Spherical Pressure Vessels with Circular Nozzles
21.60 €
WRC 374
Published Date: 1992
Papers Presented At The Conference On "Life Of Pressure Vessels" Held By The French AFIAP In 1989
38.10 €
WRC 524
Published Date: 2009
Modern Vanadium Steels for High Temperature Petroleum Reactors
50.40 €
WRC 530
Published Date: 2009
Test Methods for Hydrogen Induced Cracking
46.80 €

Best-Selling Products

NR 5002881/R/71310/001 ISSUE 4
Published Date: 04/01/2004
Standard Brickwork & Masonry Repair Details - Approval in Principle
24.30 €
NR 656JRM02 ISSUE 1.2
Published Date: 09/13/2000
PC-BASED ISM TERMINAL HARDWARE SPECIFICATION
7.50 €
NR 656JRM03 ISSUE 1.1
Published Date: 09/11/2000
PC Based ISM Terminal Installation & Maintenance Manual
13.20 €
NR 684021-BTA-00-101 ISSUE 3
Published Date: 12/01/2008
Form A & B: Traditional Front Wall Platform
35.40 €
NR 684021-BTA-00-102 ISSUE 1
Published Date: 12/17/2008
Form A & B: Crosswall & Precast Planks
35.40 €
NR 84-YS-1003/30 ISSUE H
Published Date: 04/02/2005
CCTV Monitored L.C. - Standard S.B. Control Unit Construction Details Index
5.70 €