Name:
WRC Volume 53 No. 03-04 1998 PDF
Published Date:
1998
Status:
Active
Publisher:
Welding Research Council, Inc.
CONTENTS
- Executive Committee, February 4, 1998
- Report to WRC Board of Directors on ISO TC-11 and JPVRC 20th Anniversary Meetings Jokyo Japan, November 7-13, 1997
- JPVRC Progress Reports
- Joint Task Group on Increased Code Allowable Stresses and Section VIII, Div. 2 Rewrite, February 3, 1998
- Committee on Flaw Evaluation of the COE Division, February 2, 1998
- Committee on Inspection Planning, October 6, 1997
- Design Division, February 3, 1998
- Committee on Bolted Flanged Connections, February 3, 1998
- Subcommittee on Flange Parameter Studies, February 2, 1998
- Subcommittee on Gasket Testing and Elevated Temperature Joint Behavior, February 2, 1998
- Committee on Dynamic Analysis and Testing, February 3, 1998
- Committee on Elevated Temperature Design, February 3, 1998
- Committee on Piping, Nozzles and Vessels, February 2, 1998
- Subcommittee on Flexibility Models and SIFS, Febrary 2, 1998
- Subcommittee on Vessels, February 2, 1998
- Materials and Fabrication Division, February 4, 1998
- Committee on Failure Modes of Components, February 2, 1998
- Task Group on Toughness Master Curve, February 3, 1998
- Committee on Thermal & Mechanical Effects on Materials, February 2, 1998
- Steering Committee on Cyclic Life and Evaluation Effects in Nuclear Applications, February 3, 1998
- Working Group on S-N Curve Data, February 3, 1998
| File Size : | 1 file , 6.4 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 114 |
| Published : | 1998 |