API RP 2MIM PDF

API RP 2MIM PDF

Name:
API RP 2MIM PDF

Published Date:
09/01/2019

Status:
Active

Description:

Mooring Integrity Management, First Edition

Publisher:
American Petroleum Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$44.4
Need Help?
This recommended practice (RP) provides guidance for the integrity management (IM) of mooring systems connected to a permanent floating production system (FPS) used for the drilling, development, production, and/or storage of hydrocarbons in offshore areas. The scope of this RP extends from the anchor to the connection to the floating unit (e.g. chain stopper) and includes components critical to the mooring system (e.g. turret bearings, fairleads, chain stoppers, anchors, suction piles).

Specific guidance is provided for the inspection, monitoring, evaluation of damage, fitness-for-service assessment, risk reduction, mitigation planning, and the process of decommissioning. This RP incorporates and expands on the IM recommendations found in API 2I and API 2SK. In the event of any discrepancy between API 2MIM and API 2I/API 2SK, API 2I/API 2SK will govern.

This RP is not intended for:
  • structural steelwork of turret systems and TLP tendons, which are addressed by API 2FSIM;
  • thrusters, power generation, or control system;
  • mobile offshore drilling unit (MODU) or other temporary moorings that are deployed and retrieved frequently;
  • vessels holding station via a dynamic positioning (DP) system, without the use of mooring.

Edition : 1st
File Size : 1 file , 4 MB
Note : This product is unavailable in Ukraine, Russia, Cuba, Syria, Belarus, Iran, North Korea
Number of Pages : 83
Product Code(s) : G2MIM01, G2MIM01, G2MIM01
Published : 09/01/2019

History


Related products

API RP 2I (R2020)
Published Date: 04/01/2008
In-service Inspection of Mooring Hardware for Floating Structures, Third Edition
$49.5
API RP 2T (R2023)
Published Date: 07/01/2010
Recommended Practice for Planning, Designing and Constructing Tension Leg Platforms, Third Edition
$75.9
API RP 2D
Published Date: 12/01/2014
Operation and Maintenance of Offshore Cranes, Seventh Edition, Includes Errata (2014) and Addendum (2020)
$48.6

Best-Selling Products