API RP 756 (R2020) PDF

API RP 756 (R2020) PDF

Name:
API RP 756 (R2020) PDF

Published Date:
09/01/2014

Status:
Active

Description:

Management of Hazards Associated with Location of Process Plant Tents, First Edition

Publisher:
American Petroleum Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$42
Need Help?
This Recommended Practice (RP) provides guidance for managing the risk from explosions, fires and toxic material releases to on-site personnel located in tents. The term "tent" is used to describe a wide range of structures and is defined in 3.18. This RP was developed for use at refineries, petrochemical and chemical operations, natural gas liquids extraction plants, natural gas liquefaction plants, and other onshore facilities covered by OSHA 29 CFR 1910.119.

The focus of this RP is primarily on process related hazards. However, non-process related hazards may exist which could present risks to tent occupants. Previous incidents have demonstrated that tent occupants are susceptible to injuries from fires originating inside the tent, from tent collapse due to extreme weather, and from falling objects. Some of these hazards are addressed by tent design standards, manufacturer's recommendations, and local regulations.

This RP is based on the following guiding principles.

a) Locate personnel away from process areas consistent with safe and effective operations.
b) Minimize the use of tents intended for occupancy in close proximity to process areas.
c) Manage the occupancy of tents in close proximity to process areas.
d) Design, construct, install, modify, and maintain tents intended for occupancy to mitigate hazards that the tent siting could present to occupants in the event of explosion, fire, and toxic material release.
e) Manage the use of tents intended for occupancy as an integral part of the design, construction, maintenance, and operation of a facility.

The American Petroleum Institute (API) performed vapor cloud explosion (VCE) tests to determine the response of tents to the potential explosion hazards that may be present at refineries, petrochemical and chemical operations. The data compiled from the testing is contained in API Technical Report (TR) 756-1, "Process Plant Tent Responses to Vapor Cloud Explosions"Results of the American Petroleum Institute Tent Testing Program".
ANSI : ANSI Approved
Edition : 1st
File Size : 1 file , 1 MB
Note : This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Number of Pages : 33
Product Code(s) : C75601, C75601, C75601
Published : 09/01/2014

History

API RP 756
Published Date: 01/01/2024
Management of Hazards Associated with Location of Process Plant Tents, Second Edition
$46.2
API RP 756 (R2020)
Published Date: 09/01/2014
Management of Hazards Associated with Location of Process Plant Tents, First Edition
$42

Related products

API TR 756-1
Published Date: 09/01/2014
Process Plant Tent Responses to Vapor Cloud Explosions - Results of the American Petroleum Institute Tent Testing Program, First Edition
$63.6
API Publ 337
Published Date: 08/01/1996
Development of Emission Factors for Leaks in Refinery Components in Heavy Liquid Service
$43.2
API RP 751
Published Date: 08/01/2021
Safe Operation of Hydrofluoric Acid Alkylation Units, Fifth Edition
$60
API RP 754
Published Date: 08/01/2021
Process Safety Performance Indicators for the Refining and Petrochemical Industries, Third Edition
$56.1

Best-Selling Products

ASQ/IEC D60300-3-1-1997
Published Date: 09/16/1997
Dependability Management - Part 3:Application Guide - Section 1 - Analysis Techniques for Dependability
$10.5
ASQ/IEC D60300-3-2-1997
Published Date: 09/16/1997
Dependability Management - Part 3:Application Guide - Collection of Dependability Data
$10.5
ASQ/IEC D61070-1997
Published Date: 09/16/1997
Compliance Test Procedures for Steady-State Availability
$10.5
ASQ/IEC D61078-1997
Published Date: 09/16/1997
Analysis Techniques for Dependability - Reliability Block Diagram Method
$10.5
ASQ/IEC D61123-1997
Published Date: 09/16/1997
Reliability Testing - Compliance Plans for Success Ratio
$10.5
ASQ/IEC D61164-1997
Published Date: 09/16/1997
Reliability Growth - Statistical Test and Estimation Methods
$10.5