AWWA ACE54491 PDF

AWWA ACE54491 PDF

Name:
AWWA ACE54491 PDF

Published Date:
06/01/2001

Status:
Active

Description:

Estimating Future Capital Replacement Needs: An Innovative Case Study From the Central Arizona Project

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The Central Arizona Project (CAP) needed an estimate of its future capital replacement and refurbishment funding needs in order to assess the adequacy of its existing wholesale water rates and the appropriate reserve levels to maintain. To meet this need, a system replacement planning analysis was prepared to estimate CAP's future capital system replacement and refurbishment funding levels. A detailed inventory database approach utilized existing CAP capital facility records, original cost data, expected useful life estimates, and facility condition assessment data to determine future capital replacement needs.Interim results provided CAP with annual capital replacement and refurbishment estimates that were used to assess the adequacy of existing wholesale water rates and reserve levels. The results were also used to help inform and educate CAP's senior management, Board of Directors, and customers on future capital funding needs. Includes tables.
Edition : Vol. - No.
File Size : 1 file , 250 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 7
Published : 06/01/2001

History


Related products

AWWA ACE54270
Published Date: 06/01/2001
Structuring Alternative Project Delivery Procurement
$7.2
AWWA ACE54263
Published Date: 06/01/2001
Pump Scheduler for Energy Optimization
$7.2
AWWA ACE54380
Published Date: 06/01/2001
Reclaimed Water as a Water Supply Strategy in the State of Texas
$7.2
AWWA ACE54281
Published Date: 06/01/2001
Integration of Lime Softening and Ultrafiltration for Surface Water Treatment: A Powerful Water Quality Combination
$7.2

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36