AWWA ACE56143 PDF

AWWA ACE56143 PDF

Name:
AWWA ACE56143 PDF

Published Date:
06/16/2002

Status:
Active

Description:

Installation of 36-inch Water Main Under Ohio River by Horizontal Directional Drilling

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This presentation chronicles the construction of a water main crossing of the Ohio River. The project is historic in the use of horizontal directional drilling to install the pipe in that it provides for the interstate sale of drinking water. The greatest technological challenge to the project was the installation of a 36-inch main across the river. Horizontal directional drilling is a trenchless construction technology with increasing use in the water supply industry. This project demonstrates the application of the technology for installing large diameter pipes over long distances. Route selection involved not only consideration of the final pipeline alignment but also the staging area where the pipe was to be welded to prepare the string to be pulled into the bore. At the crossing location, the river is 1,800 feet wide. The total bore length was nearly 3,000 feet. The end locations were selected to permit the angular bores down to and back up from the crossing elevation and to provide setup areas on either side of the river for the drilling equipment and the drilling mud handling systems. The route crossed beneath a bridge and required precise steering of the drilling head to pass between the pile supports for the bridge. Photographs show the pipe staging and drilling operations. Challenges encountered during the operation are discussed, and observations on the application of directional drilling in the water industry are provided. Includes figures.
Edition : Vol. - No.
File Size : 1 file , 2.3 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 15
Published : 06/16/2002

History


Related products

AWWA ACE56139
Published Date: 06/16/2002
Implementation of Finished Water Storage for Multi-Day Averaging of Peak Demands
$7.2
AWWA ACE56149
Published Date: 06/16/2002
Bridging the Gap Between Consultant and Partner: Leveraging the Public-Private Partnership
$7.2
AWWA ACE56183
Published Date: 06/16/2002
Effect of Solution Composition on the Performance and Fouling of Polymeric Reverse Osmosis and Nanofiltration Membranes
$7.2
AWWA ACE56225
Published Date: 06/16/2002
The Willamette River Water Treatment Facility: A Design/Build Project From Meadow to Water in 28 Months
$7.2

Best-Selling Products

SAE/USCAR 1
Published Date: 12/01/1996
Salt Spray Testing and Evaluation of Fastener Finishes
SAE/USCAR 2
Published Date: 08/01/1997
Standard for Automotive Electrical Connection Systems
$33
SAE/USCAR 3
Published Date: 07/01/1997
Standard for Testing Automotive Miniature Bulbs
$30.9
SAE/USCAR 4
Published Date: 11/01/1997
Standard for Cigar Lighters and Power Outlets
SAE/USCAR 5-1
Published Date:
Avoidance of Hydrogen Embrittlement of Steel
$21.9
SAE/USCAR 5-2
Published Date:
Avoidance of Hydrogen Embrittlement of Steel
$21.9