AWWA ACE56225 PDF

AWWA ACE56225 PDF

Name:
AWWA ACE56225 PDF

Published Date:
06/16/2002

Status:
Active

Description:

The Willamette River Water Treatment Facility: A Design/Build Project From Meadow to Water in 28 Months

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The City of Wilsonville (City), population 14,000, is located along Interstate 5 at the north end of the Willamette Valley approximately 12 miles south of Portland. Although lying on the banks of the Willamette River, it has historically obtained water from eight wells located in an underlying deep bed basalt aquifer with steadily declining water levels. Projected system demands matched production leading to the declaration of a moratorium on new planning approvals (limiting the amount and rate of growth) in January 1998 pending the successful determination and construction of a new long-term water supply source. Staff was directed to conduct an evaluation of available options and to report back to the City Council with its findings. The three available options, along with the summarized reasons why each alternative was ultimately determined to be acceptable/unacceptable, include: additional wells, due to the City's location within a groundwater sensitive area, as established by the State of Oregon and local residential/agricultural objections, securing the necessary permits for additional wells was not possible; connection to Portland's "Bull Run" surface water system, due to the high construction costs, the need to traverse several neighboring communities with large diameter piping and the uncertainty of a long term water availability guarantee this option was similarly eliminated; and, a new water treatment facility on the Willamette River, given the treatability of the Willamette River, as confirmed by water quality studies extending back approximately ten years and recent pilot testing, the City Council determined that the Willamette River option best met it's long term water supply needs. Summarily, staff was directed to look to the construction of a state-of-the-art multi-barrier water treatment facility (Facility) producing water that would exceed EPA/State of Oregon drinking water standards. This alternative was additionally attractive due to the pre-existing (1973) water rights that the City held with it's partner, the Tualatin Valley Water District (TVWD). In 1999 an election was held in which the citizens of Wilsonville were asked to affirm the City Council's decision to choose the Willamette River as the City's long term water supply source and to approve $25,000,000 in revenue bonds to finance construction. With the successful passage, the City's revenue bond proceeds were combined with funding from TVWD for construction of the $43,000,000 facility. Construction commenced in July 2000.
Edition : Vol. - No.
File Size : 1 file , 270 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 10
Published : 06/16/2002

History


Related products

AWWA ACE56156
Published Date: 06/16/2002
Evaluation of Membrane Surface Fouling Patterns Using a Flatbed Scanner and Scanning Electron Microscope
$7.2
AWWA ACE56135
Published Date: 06/16/2002
Infrastructure Issues at Small (Air Force) Water Systems
$7.2
AWWA ACE56165
Published Date: 06/16/2002
High Rate/High Efficiency Process Applied to Variable Raw Water Quality
$7.2
AWWA ACE56169
Published Date: 06/16/2002
Design of UV Disinfection System for In-Plant Recycle Stream Treatment
$7.2

Best-Selling Products

ISO/TTA 1:1994
Published Date: 04/01/1994
Advanced technical ceramics - Unified classification system
$55.5
ISO/TTA 2:1997
Published Date: 04/01/1997
Tensile tests for discontinuously reinforced metal matrix composites at ambiant temperatures
$33.3
ISO/TTA 3:2001
Published Date: 09/01/2001
Polycrystalline materials - Determination of residual stresses by neutron diffraction
$55.5
ISO/TTA 4:2002
Published Date: 11/01/2002
Measurement of thermal conductivity of thin films on silicon substrates
$41.4
ISO/TTA 5:2007
Published Date: 10/01/2007
Code of practice for creep/fatigue testing of cracked components
$75