This slide presentation outlines information on comparing standard monitoring programs (SMP) and modeling system-specific studies (SSS) for Stage 2 DBP site selection. The objectives of this effort were to:
determine sites as if SMP (every 60 days);
determine sites as if SSS (one sampling);
determine "true" sites (monthly monitoring); and,
compare results of SSS and SMP. Topics covered include: Greater Cincinnati Water Works (GCWW) system overview; model requirements for initial distribution system evaluation (IDSE); selecting potential Stage 2B Sites; and, performing the IDSE - SSS: using sample data.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 7.8 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 32 |
| Published : | 06/17/2004 |