This slide presentation outlines information on Phoenix, Arizona's Union Hills WTP 160 MGD
Improvements Project. The project was done in three phases: Phase 1 involved
rebuilding the existing 32 filters and
constructing 4 new 5 MGD filters; Phase 2 involved a raw water impoundment split; Phase 3a involved pretreatment facilities and Phase 3b involved an interim dewatering building. Further topics covered include: design
criteria for residuals handling; high turbidity events; comparing operational parameters; residuals parameters during
high turbidity events; raw and settled tubidities; average turbidity and production; total organic carbon removals; centrifuge dewatering parameters
during high turbidity events; residuals parameters during
high turbidity events; and, residuals contingency plans.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 2.1 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 39 |
| Published : | 06/17/2005 |