AWWA ACE63096 PDF

AWWA ACE63096 PDF

Name:
AWWA ACE63096 PDF

Published Date:
06/01/2006

Status:
Active

Description:

Integrated Water Infrastructure Master Planning for Dallas Water Utilities

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This slide presentation outlines integrated water infrastructure master planning for Dallas Water Utilities (DWU). Project objectives included: prepare for future growth; reinvestment / renewal of existing infrastructure; and, GASB 34 Compliance. Topics outlined include: complexity of DWU; phased project approach designed to effectively meet DWU's needs; model attribution and data sets; model calibration and results; pipeline assessment approach; rehab/replacement program; remaining life of existing infrastructure; and, distribution system asset value evaluation. Includes tables, figures.
Edition : Vol. - No.
File Size : 1 file , 1.4 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 15
Published : 06/01/2006

History


Related products

AWWA ACE62953
Published Date: 06/01/2006
The Impact of Federal NPDES Guidelines on Water Utilities
$7.2
AWWA ACE62956
Published Date: 06/01/2006
Implementation of Residuals Handling at an Immersed Membrane Treatment Facility
$7.2
AWWA ACE63091
Published Date: 06/01/2006
Control of Nonpoint Source Pollution in the Hickory Creek Basin of Denton, Texas
$7.2
AWWA ACE63140
Published Date: 06/01/2006
Fate and Transport of Disinfection Byproducts in Surface Waters Receiving Wastewater Discharges
$7.2

Best-Selling Products