AWWA ACE65167 PDF

AWWA ACE65167 PDF

Name:
AWWA ACE65167 PDF

Published Date:
06/01/2007

Status:
Active

Description:

Meeting Multiple Challenges on a Small Site with Advanced Membrane Filtration and Granular Activated Carbon

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
The City of Scottsdale's Chaparral Water Treatment Plant recently began operation treating Salt River Project water using an innovative integrated process consisting of coagulation for arsenic removal, direct filtration through submerged ultrafiltration membranes, and granular activated carbon (GAC) contactors for removal of total organic carbon (TOC) and taste and odor causing compounds. Ancillary processes include plate settlers for wash water recovery and centrifuges for solids removal. The unique process for this new 30 mgd facility was developed through six months of pilot-scale operations which competitively evaluated four membrane systems as well as ozone and two different types of GAC. Membrane processes were preferred due to the very small site and the highly variable water quality delivered to the plant. The entire facility, including the 5.5 MG buried reservoir, sits on only 11 acres and is constructed to minimize neighborhood impact. Substantial challenges existed for the design and construction of the facilities. In addition to a very small, irregularly shaped site, the issues of adjacent neighbors needed to be addressed, views of Camelback Mountain needed to be maintained, the park facilities needed to be upgraded, significant variations in turbidity and arsenic needed to be controlled, and disinfection byproduct (DBP) formation needed to be reduced in the system. Clearly, an advanced treatment system to treat multiple challenges was required.
Edition : Vol. - No.
Number of Pages : 5
Published : 06/01/2007

History


Related products

AWWA ACE65429
Published Date: 06/01/2007
A Case for Installing an Anode with Every Repair of a Cast Iron Water Main
$7.2
AWWA ACE65486
Published Date: 06/01/2007
Options, Decisions, and Choices: An Evaluation for Converting from Lime Softening to Membrane Treatment
$7.2
AWWA ACE65489
Published Date: 06/01/2007
How to Construct the World's Largest Prestressed Concrete Tank: 40.0 MG Twin Oaks #2 Reservoir
$7.2
AWWA ACE65473
Published Date: 06/01/2007
Waste Stream Management for MF/UF
$7.2

Best-Selling Products

EPI DCOS (C)
Published Date: 02/01/2016
(CHINESE - TRADITIONAL) Data Centre Operations Standard
$41.1
EPI DCOS (S)
Published Date: 05/01/2016
(SPANISH) Estándar de Operaciones de Centros de Datos
$41.1
EPI DCOS
Published Date: 10/01/2021
Data Centre Operations Standard
$4.2
EPI DCOS
Published Date: 02/01/2016
(ENGLISH) Data Centre Operations Standard
$41.1