AWWA ACE65314 PDF

AWWA ACE65314 PDF

Name:
AWWA ACE65314 PDF

Published Date:
06/01/2007

Status:
Active

Description:

Getting Membrane Performance Out of a Conventional Filtration Plant in a Small Community

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The Town of Slave Lake is located in the north-central area of the Province of Alberta, Canada. The Town receives its water supply from Lesser Slave Lake. The existing conventional treatment plant was constructed in 1982 and has a hydraulic capacity of 7 ML/d (1.85 MGD). As part of the improvement program, chemical feed systems are upgraded based on jar test optimization findings. A new powdered activated carbon feed system was installed by utilizing the unused space of an old clearwell. New feed systems for polymer, acid and caustic were also installed. This enabled the Town to practice enhanced coagulation to achieve required organic removals, taste and odor control, and to stabilize plant performance. Other upgrades included incorporation of tube settlers into two of the three clarifier basins (to achieve future capacity), installation of automated sludge collection systems in the clarifiers, and the conversion of a third clarifier to a disinfectant contact tank to achieve required Giardia and viral inactivation. Filter underdrains and media were also replaced. With such improvements and the practice of optimized enhanced coagulation, the water treatment plant achieved all of its treatment goals (<0.05 NTU turbidity, <20 particles [>2 um] counts/mL). The upgrades also allowed the Town to extend the service life of the treatment facility beyond its original prediction, which could postpone a membrane upgrade by many more years. The success of this plant upgrade and process optimization enabled the conventional facility to produce water that is comparable to microfiltration-produced water. This paper describes the above upgrades and implementation of upgrades while maintaining production. Includes 6 references, table, figure.
Edition : Vol. - No.
File Size : 1 file , 7 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 19
Published : 06/01/2007

History


Related products

AWWA ACE65614
Published Date: 06/01/2007
Zenon, Ozone, and Biological Filtration: Alternatives to Packed Tower Aeration for Hydrogen Sulfide Removal
$7.2
AWWA ACE65429
Published Date: 06/01/2007
A Case for Installing an Anode with Every Repair of a Cast Iron Water Main
$7.2
AWWA ACE65488
Published Date: 06/01/2007
Challenges of Implementing the First Direct Filtration Membrane WTP in Georgia
$7.2
AWWA ACE65489
Published Date: 06/01/2007
How to Construct the World's Largest Prestressed Concrete Tank: 40.0 MG Twin Oaks #2 Reservoir
$7.2

Best-Selling Products

DID DI-ADMN-80222
Published Date: 08/05/1986
CLASSIFIED PROCESSING EQUIPMENT INVENTORY
$3.6
DID DI-ADMN-80239
Published Date: 09/15/1986
INFORMATION SYSTEMS ACCREDITATION DOCUMENTATION (SUPERSEDING DI-S-1831)
$3.6
DID DI-ADMN-80426
Published Date: 08/28/1987
COMPETITIVE SUBCONTRACTS REPORT (CSR)
$3.6
DID DI-ADMN-80447
Published Date: 09/28/1987
CONTRACT SUMMARY REPORT (SUPERSEDING DI-A-5030B)
$3.6
DID DI-ADMN-80447A
Published Date: 11/08/2006
CONTRACT SUMMARY REPORT (SUPERSEDING DI-ADMN-80447)
$3.6
DID DI-ADMN-80925
Published Date: 01/05/1990
REVISIONS TO EXSISTING GOVERNMENT DOCUMENTS
$7.2