This powerpoint presentation begins by providing background information on Arlington County, Virginia, and the Fort Ethan Allen Pump Station. Key project objectives included:
Increase Transmission Capacity into Arlington
County's Minor Hill Reservoir from the
Dalecarlia WTP;
the Additional Capacity to Meet Growth
Demands through Buildout;
provide additional Fire Flow Capacity to
Williamsburg Middle School, 5,000 gpd Design Flow; and,
increase Water Transmission Capacity to Minor
Hill Reservoir from 9 MGD to Approximately 14
MGD. Topics outlined include: original master plan alternative; original master plan water main improvements; hydraulic gradient with the original master plan alternative hydraulic gradient with the origin; existing pump and system curves; hydraulic modeling approach; key hydraulic findings of the original master plan alternative; key design challenges; alternative water system improvements; key elements of alternative; existing floor plan of Fort Ethan Allen Pumping Station; modified floor plan; interior photos prior to construction; new header wall penetration; and, exterior and interior construction photos. Includes figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 8.8 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 42 |
| Published : | 06/01/2007 |