AWWA ACE65404 PDF

AWWA ACE65404 PDF

Name:
AWWA ACE65404 PDF

Published Date:
06/01/2007

Status:
Active

Description:

Edmonton's Water Reuse Facility Addresses Water Allocation and Watershed Protection Challenges

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The demand for water in the Edmonton region is increasing rapidly as industry grows. At the same time, there is an increasing concern for the quantity and quality of water in the North Saskatchewan River. Alberta Environment is balancing water allocation with the need for responsible watershed protection. Future competition for limited water supplies will certainly increase; water users will need to find innovative solutions such as water reuse to meet their needs. In addition, Alberta Environment is concerned with the quality of return water to the North Saskatchewan River as the river has a finite capacity to assimilate discharges and maintain a healthy aquatic ecosystem. Alberta Environment appears to be heading towards receiving stream load limits resulting in the need to meet increasingly more stringent effluent standards or to divert effluent for reuse. The City of Edmonton and Petro-Canada are leading the way in addressing these water allocation and watershed protection challenges. They have forged a successful partnership to transform municipal wastewater effluent into high quality reuse water. The water is suitable as a source for industry's subsequent treatment by reverse osmosis membranes, for cooling water make-up or other uses where there is a water demand. In addition, river valley parks and recreational facilities plan to use the water. In early 2006, Canada's largest membrane-based water reuse facility commenced delivery of up to 5 ML/d water supply to its first industrial complex, the Air Products Hydrogen Plant which produces hydrogen for the Petro-Canada Edmonton Refinery. By October 2007, the membrane facility will have the capability of delivering up to 15 ML/d sustained water supply and meet peak water demands of up to 20 ML/d. A portion of the flow will also be available for in-plant needs at the City of Edmonton's Gold Bar Wastewater Treatment Plant; pond filling, fountains and irrigation at nearby parks; and snow making for the local cross-country ski club. With future expansion, the facility could ultimately be capable of producing up to 40 ML/d to meet additional industrial water reuse and other needs. Other benefits include the reduction of the wastewater effluent discharge loads on the North Saskatchewan River. Includes 3 references, tables, figures.
Edition : Vol. - No.
File Size : 1 file , 3.1 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 39
Published : 06/01/2007

History


Related products

AWWA ACE65127
Published Date: 06/01/2007
A Study of Electrocoagulation-Microfiltration Process for Virus Removal from Natural Water
$7.2
AWWA ACE65294
Published Date: 06/01/2007
What Are Utilities Really Paying for Agricultural Contamination?
$7.2
AWWA ACE65128
Published Date: 06/01/2007
A Serial Filtration Investigation of Membrane Fouling by Natural Organic Matter
$7.2
AWWA ACE65117
Published Date: 06/01/2007
Reductive Dechlorination of Trichloroethylene Using Boron Doped Diamond Film Electrode
$7.2

Best-Selling Products

ISA 100.11A
Published Date: 05/04/2011
Wireless systems for industrial automation: Process control and related applications
$95.7
ISA 100.11A
Published Date: 01/01/2009
Wireless systems for industrial automation: Process control and related applications
$178.8
ISA 101.01
Published Date: 07/09/2015
Human Machine Interfaces for Process Automation Systems
$78.3
ISA 106.00.01
Published Date: 06/15/2023
Procedure Automation for Continuous Process Operations
$98.1
ISA 107.1
Published Date: 01/29/2013
Industry Standard File Format for Revolution-Based Tip Timing Data
$21.9
ISA 12.00.01
Published Date: 07/15/1999
Electrical Apparatus for Use in Class I, Zones 0, 1, & 2 Hazardous (Classified) Locations - General Requirements
$20.7