This powerpoint presentation begins by providing background information on the city of Tiajuana, Mexico. The objectives of this presentation include:
determining the amount of distress in 13 km
section of 72" PCCP pipe;
confirming and validating assumptions;
confirming results; and,
devising a maintenance / rehabilitation /
replacement strategy, based on the actual
condition;
limit unexpected expenditures and liabilities; and,
save money while maintaining the pipeline
integrity. Technology capabilities are given for Embedded Cylinder Pipe AWWA C301, Lined Cylinder Pipe AWWA C301, and Bar Wrapped Pipe AWWA C303. Information is outlined on pipes in Tiajuana, along with manned and unmanned inspections, signal types, RFEC/TC, Tijuana Inspection Results, Repair and Rehabilitation Options, Risk of Excavation of
Distressed Pipe, Repair by Post-Tensioning, Restoring Pre-stress Force, Restoring the original strength
of the pipe, Two essential characteristics of
POLYSTRAND™, Extruded Molten Polymer Onto Corrosion
Inhibitor Encased Strand, Benefits/Pertinence of the
Tendon PCCP Repair System, and project status. Includes tables, figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 5.2 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 40 |
| Published : | 06/01/2007 |