AWWA ACE68605 PDF

AWWA ACE68605 PDF

Name:
AWWA ACE68605 PDF

Published Date:
11/01/2008

Status:
Active

Description:

From Chaos to Crisis to Kumbaya

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This powerpoint presentation presents Alternate Project Delivery (APD) methods which were developed to address weaknesses in the traditional design-bid-build (D-B-B) delivery method. Advantages of APD methods are provided, along with APD challenges, APD contact information, and increased owner control.
Edition : Vol. - No.
File Size : 1 file , 800 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 20
Published : 11/01/2008

History


Related products

AWWA ACE69107
Published Date: 11/01/2008
Treatment Equity: Can Conventional Treatment Make the Grade When Membrane Filtration Joins the Water System?
$7.2
AWWA ACE68804
Published Date: 11/01/2008
Balancing Water Resources for Maximum Benefit
$7.2
AWWA ACE68870
Published Date: 11/01/2008
Vulnerability, Issues, Threats and Risk for Great Lakes Water Plants in Ontario
$7.2
AWWA ACE69115
Published Date: 11/01/2008
DBP Removal Versus DBP Control
$7.2

Best-Selling Products