This powerpoint presentation begins by presenting background information on the bromate mitigation project, including: plant operation prior to study; bromate formation; and, an initial study done in 2006-2007. Bromate mitigation objective included: demonstrate Bromate Mitigation Strategies at
full-scale level;
pH depression via CO<sub>2</sub> addition; and,
Cl<sub>2</sub>/NH<sub>3</sub> addition. The Bromate Mitigation Testing Layout is presented, along with demonstration testing, preliminary CO<sub>2</sub> data analysis CO<sub>2</sub> testing results (pH = 7.2) and (O3/TOC = 1.0), CO<sub>2</sub> dosing, observations of CO<sub>2</sub> testing, Cl<sub>2</sub>/NH<sub>3</sub> additional testing, status and results (bench-scale), and TTHM formation (Bench-Scale). Includes figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 3 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 26 |
| Published : | 11/01/2008 |