AWWA ACE69003 PDF

AWWA ACE69003 PDF

Name:
AWWA ACE69003 PDF

Published Date:
11/01/2008

Status:
Active

Description:

LT2ESWTR Compliance for the Fallbrook PUD Red Mountain Reservoir

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This powerpoint presentation begins by presenting a brief overview of the LT2ESWTR as a regulatory driver: concerned with uncovered finished water reservoir provisions; separate from "Toolbox"; "Inactivation and/or Removal"; and, enabling technology - UV. Process options are presented, along with physical setting, system hydraulics, water quality, equipment pre-selection, and facility design. Presentation conclusions indicate the following: UV/Cl2/NH2Cl system received conditional approval; health official(s) input at technology/approach screening, validation workshop, 30%, 60%, and 90% design; system sized for future flow and water quality challenges; successful pre-selection; project going to bid in late-2008; and, construction and start-up in 2009. Includes tables, figures.
Edition : Vol. - No.
File Size : 1 file , 2.2 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 26
Published : 11/01/2008

History


Related products

AWWA ACE68627
Published Date: 11/01/2008
Intermediates of Cyanobacterial Toxins with Hydroxyl-Radical Based Advanced Oxidation Technologies (HR-AOTs)
$7.2
AWWA ACE69030
Published Date: 11/01/2008
Startup of an Extremely Fast Track Municipal Effluent Recycling Facility in Australia
$7.2
AWWA ACE68924
Published Date: 11/01/2008
Winnipeg Lead Control Program: Phosphate Inhibition for Lead Control
$7.2
AWWA ACE68894
Published Date: 11/01/2008
Using the Design-Build Process to Meet Community Stakeholder Interests to Construct an Atlanta Region Water Reuse Project
$7.2

Best-Selling Products