This powerpoint presentation begins by providing a brief overview of the Bossier City water treatment plant (WTP) and information on the project background including the following:
expand treatment capacity from 25 mgd to
45 mgd;
evaluated conventional treatment, ultrafiltration/microfiltration (UF/MF)
membrane treatment, and UF/MF and reverse osmosis (RO)
treatment for capacity expansion; and,
pilot study required to evaluate UF/MF and
RO membrane treatment. The Status of the project is presented and includes the following:
pilot study report was finalized in May 2008;
selected settled water pretreatment for full-scale
design; and,
design will be finished in first quarter 2009. Includes tables, figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 2.4 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 23 |
| Published : | 11/01/2008 |