This powerpoint presentation begins by providing a brief overview of the study to assess pipe condition, consider rehabilitation instead of
replacement, and reduce capital improvement plan (CIP) cost if possible
in Ogden Canyon, Utah. Facets of inspection planning are presented, along with inspection plan challenges, ultrasonic inspection, coupon testing, leak detection - Sahara® Technology, leak detection - instrument readings, pipe repair rehabilitation techniques, and pipeline hydraulic capacity consideration. Presentation summary indicates the following: Combine Inspection Technologies To Better Assess Condition of Pipe; Inspection Planning Involves Attention to Details; Rehabilitation Technology Selected To Optimize Hydraulic Capacity and Continued Use of Existing Pipeline Still With Remaining Life; and, Condition Assessment and Rehabilitation Significantly Reduces CIP
Cost While Maintaining A High Level of Service to Customers.
Includes tables.
| Edition : | Vol. - No. |
| Number of Pages : | 21 |
| Published : | 11/01/2009 |