This powerpoint presentation begins by providing a brief overview of conservation measures at the San Antonio Water System (SAWS) that included implementation of a multi-phase brackish
groundwater desalination (BGD) evaluation during 2005-2006.
Phase 2, 2006-2008, included development of a
feasibility study of BGD and detailed
hydrogeologic evaluations.
Phase 3, 2007-2009, implemented a
membrane pilot study. Project objectives were to:
provide sufficient background
information, operating and water quality
data for design-build teams; and,
enable SAWS to initiate the permitting of
the final full-scale facility early in the
design-build process. Testing protocol is presented, along with reverse osmosis (RO) treatment systems, the demonstration scale pilot, testing results, and membrane fouling. Includes tables, figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 2.5 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 30 |
| Published : | 11/01/2009 |