AWWA ACE70727 PDF

AWWA ACE70727 PDF

Name:
AWWA ACE70727 PDF

Published Date:
11/01/2009

Status:
Active

Description:

Employing Asset Management Principles to Build Stakeholder Relationships and Enhance Capital and Financial Decisions

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This powerpoint presentation begins by providing a brief overview of the New Jersey Water Supply Authority (NJWSA) and the Manasquan Water Treatment Plant and infrastructure. The Asset Management Plan Implementation Case Study is presented, and had the following objectives: evaluate condition, criticality, and remaining useful life of major plant assets; collect and analyze key asset attribute data including manufacturer, model, years in service, remaining useful life, etc.; assess future regulatory needs and issues; identify major capital projects required over the next 20 years to meet expected service level, risk, and/or regulatory requirements; short-term needs and long term R&R requirements; and, develop a 20 year financial analysis and expenditure forecast. NJWSA used a step process to develop the asset management plan that used the principles of asset management. Topics covered include: A Formal Condition Assessment Methodology Supported the AMP Development; Project Priority was determined by Evaluating Criticality and Condition; the AMP Outcome Aligned with NJWSA's Goal of Sustainability and Long Term Planning; Near Term Enhancement Projects were the Largest Driver of Financial Requirements; instrumentation and control enhancement projects; Sludge Lagoons and Recycle System Enhancement Project; the CIP Highlighted Financial Implications for the Communities Served; alternative funding options; and, Future Implementation Considerations for NJWSA. Includes figures.
Edition : Vol. - No.
File Size : 1 file , 3.2 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 25
Published : 11/01/2009

History


Related products

AWWA ACE70750
Published Date: 11/01/2009
Implementation of the Oxnard, California Innovative Advanced Water Purification Facility
$7.2
AWWA ACE70848
Published Date: 11/01/2009
Optimizing Pump Scheduling to Reduce Energy Costs in Water Utilities
$7.2
AWWA ACE70687
Published Date: 11/01/2009
Undertaking a Validated Water Audit in an Unmeasured System
$7.2
AWWA ACE70606
Published Date: 11/01/2009
Estimating the Risk of Virus Intrusion into the Distribution System
$7.2

Best-Selling Products

SN-CEN ISO/ASTM/TR 52905:2023
Published Date: 07/13/2023
Additive manufacturing of metals - Non-destructive testing and evaluation - Defect detection in parts (ISO/ASTM TR 52905:2023)
SN-CEN ISO/ASTM/TR 52906:2022
Published Date: 07/01/2022
Additive manufacturing - Non-destructive testing - Intentionally seeding flaws in metallic parts (ISO/ASTM/TR 52906:2022)
SN-CEN ISO/ASTM/TR 52912:2020
Published Date: 10/21/2020
Additive manufacturing - Design - Functionally graded additive manufacturing (ISO/ASTM/TR 52912:2020)
SN-CEN ISO/ASTM/TR 52916:2022
Published Date: 03/01/2022
Additive manufacturing for medical - Data - Optimized medical image data (ISO/ASTM TR 52916:2022)
SN-CEN ISO/ASTM/TR 52917:2022
Published Date: 11/28/2022
Additive manufacturing - Round robin testing - General guidelines (ISO/ASTM TR 52917:2022)
SN-CEN ISO/ASTM/TR 52952:2023
Published Date: 07/25/2023
Additive Manufacturing of metals - Feedstock materials - Correlating of rotating drum measurement with powder spreadability in PBF-LB machines (ISO/ASTM TR 52952:2023)