AWWA ACE91196 PDF

AWWA ACE91196 PDF

Name:
AWWA ACE91196 PDF

Published Date:
01/01/1991

Status:
Active

Description:

Aquifer Storage and Recovery in Chesapeake, Virginia

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The preliminary assessment of aquifer storage and recovery (ASR) feasibility for Chesapeake addressed the following issues: water supply and demand, hydrogeology, water quality, suitability, environmental issues, permitting and necessary facilities. The preliminary assessment indicated that the proposed project site met the three criteria for ASR which are: 1) Seasonal variation in water supply, water demand, or both. Typically when the ratio of maximum- annual-day to average-annual-day demand is equal to or exceeds 1.3, this criterion is met. 2) A reasonable scale of water facilities capacity. Because of economies of scale and the initial cost of developing ASR wells, it may be an inappropriate technology below 1 mgd useful recovery capacity. 3) A suitable storage zone, considering geologic, hydrologic, quantity, quality, engineering, and logistical factors.
File Size : 1 file
ISBN(s) : 0898675928
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 7
Published : 01/01/1991

History


Related products

AWWA ACE91226
Published Date: 01/01/1991
Computer Modeling at Elizabethtown Water Company
$7.2
AWWA ACE91192
Published Date: 01/01/1991
Multiple-Use High-Service Pump Stations in Fairfax County (VA) Water Authority
$7.2
AWWA ACE91183
Published Date: 01/01/1991
Pipeline Design Lessons of Recent Prestressed Concrete Pressure Pipe Failures
$7.2
AWWA ACE91182
Published Date: 01/01/1991
Acquiring and Financing Federal Reservoir Storage: Kansas River Experience
$7.2

Best-Selling Products

PFI ES11
Published Date: 01/01/1996
Permanent Marking on Piping Materials
PFI ES16
Published Date: 01/01/1985
Access Holes, Bosses and Plugs for Radiographic Inspection of Pipe Welds
PFI ES1
Published Date: 07/01/1995
Internal Machining & Solid Machined Backing Rings for Circumferential Butt Welds
PFI ES20
Published Date: 01/01/1997
Wall Thickness Measurement by Ultrasonic Examination
PFI ES21
Published Date: 01/01/1992
Internal Machining & Fit-Up of GTAW Root Pass Circumferential Butt Welds
PFI ES22
Published Date: 01/01/1995
Recommended Practice for Color Coding of Piping Materials