AWWA ACE92091 PDF

AWWA ACE92091 PDF

Name:
AWWA ACE92091 PDF

Published Date:
01/01/1992

Status:
Active

Description:

Low Cost Membrane Softening--One Year of Operation With a Hybrid Membrane System

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
A description of the Indian River County membrane softening plant, including operation and maintenance costs (energy, chemicals, membrane replacement, labor, plant utilization, blend rate), and construction costs are detailed in this paper.
File Size : 1 file
ISBN(s) : 0898676509
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 20
Published : 01/01/1992

History


Related products

AWWA ACE92100
Published Date: 01/01/1992
Balancing Environmental Concerns With Traditional Water Utility Needs--A Case History
$7.2
AWWA ACE92095
Published Date: 01/01/1992
Converting a Surface Water Supply From Agricultural to Municipal Use
$7.2
AWWA ACE92092
Published Date: 01/01/1992
Report on the Safe Yield Survey of Large Water Utilities
$7.2
AWWA ACE92089
Published Date: 01/01/1992
Innovative Reverse Osmosis Pretreatment Processes for Wastewater Reclamation
$7.2

Best-Selling Products

PIP ARC01015
Published Date: 06/01/2002
Architectural and Building Utilities Design Criteria
$55.5
PIP ARC01015
Published Date: 02/01/2009
Architectural and Building Utilities Design Criteria [Complete Revision]
$57
PIP ARC01015
Published Date: 12/01/2014
Architectural and Building Utilities Design Criteria [Complete Revision]
$55.5
PIP ARC01016-EEDS
Published Date: 02/01/2009
Electronic Entry Data Sheet for Building
$15
PIP ARC01016-EEDS
Published Date: 12/01/2014
Electronic Entry Data Sheet for Building [Complete Revision]
$15
PIP ARC01016
Published Date: 08/01/2002
Building Data Sheet
$15