AWWA ACE93234 PDF

AWWA ACE93234 PDF

Name:
AWWA ACE93234 PDF

Published Date:
01/01/1993

Status:
Active

Description:

A Comparison of Implementation Alternatives for Control System Modernization Projects

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The following important issues for implementing control system modernization projects are discussed in this paper, supported by case studies of actual projects: (1) control system modernization is now integral to long-range capital improvement planning for most utilities; (2) work elements unique to control system projects must occur in sequence; (3) design approaches offer considerable contracting flexibility and differ according to which project entity (contractor or consultant, for example) is responsible for the various design tasks; (4) design approaches have differing effects on owner satisfaction and cost; (5) the greatest impact of the procurement method is on owner satisfaction; (6) some design approach and procurement method combinations are more suitable for control system modernization projects than others.
File Size : 1 file
ISBN(s) : 0898677157
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 22
Published : 01/01/1993

History


Related products

AWWA ACE93247
Published Date: 01/01/1993
A New Water Plant for a New Supply at Tucson, Arizona
$7.2
AWWA ACE93244
Published Date: 01/01/1993
Upgrading a Water Treatment Plant to Meet SDWA and Code Requirements
$7.2
AWWA ACE93243
Published Date: 01/01/1993
More for Less: Innovative Approach Increases Plant Capacity at Laredo, Texas
$7.2
AWWA ACE93217
Published Date: 01/01/1993
Single Jet High Performance Water Meters for Large Services
$7.2

Best-Selling Products