AWWA ACE93253 PDF

AWWA ACE93253 PDF

Name:
AWWA ACE93253 PDF

Published Date:
01/01/1993

Status:
Active

Description:

An Innovative Raw Water Intake Design: Withdrawing 200 MGD From a Shallow River While Preserving Aquatic Biology

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This paper presents the Elizabethtown Water Company's (EWC) innovative solution to a challenging problem: How to withdraw 200 mgd from a shallow river while protecting indigenous fish species. As a part of its new Canal Road Water Treatment Plant (WTP) construction project, EWC plans to build an intake to withdraw 200 mgd (8.8 m3/s) from the Raritan and Millstone Rivers in central New Jersey. The site presents engineering and environmental constraints that are typical in riverine settings. In the vicinity of the intake, the river is only about 6 feet (1.8 m) deep. Under various river conditions, sediment, river bed load, frazil ice, and zebra mussels can potentially clog intake screens and impair their operation. The proposed facility will be located in a flood plain and conventional above-grade structures would be challenged by regulatory agencies. The intake location will be downstream of a river section that is stocked with trout, and a program for restoration of American shad is also being implemented in the River. Therefore, the intake design must provide protection from impingement and entrainment of fish, eggs, and larvae. The objectives of the raw water intake design are to: reliably deliver 200 mgd raw water supply; control sediment and bed load deposition; protect native fish, eggs, and larvae; control frazil ice formation; control zebra mussel infestation; and meet stringent regulatory requirements.
File Size : 1 file
ISBN(s) : 0898677157
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 13
Published : 01/01/1993

History


Related products

AWWA ACE93237
Published Date: 01/01/1993
PLCs Help Quench City of Milpitas' Thirst
$7.2
AWWA ACE93236
Published Date: 01/01/1993
Can Computers Replace People in Water Treatment Operations? Guidelines for Staffing Adjustments Through Automation
$7.2
AWWA ACE93235
Published Date: 01/01/1993
Maintaining Automated Plant Operation During a Plant Expansion
$7.2
AWWA ACE93227
Published Date: 01/01/1993
AWWA Package Plant Research & Evaluation Project
$7.2

Best-Selling Products

BS EN ISO 1:2002
Published Date: 09/20/2002
Geometrical product specifications (GPS). Standard reference temperature for geometrical product specification and verification
$48.006
BS EN ISO 10007:1997
Published Date: 02/15/1996
Quality management. Guidelines for configuration management
$79.248
BS EN ISO 10012:2003
Published Date: 08/04/2003
Measurement management systems. Requirements for measurement processes and measuring equipment
$79.248
BS EN ISO 10052:2004+A1:2010
Published Date: 08/31/2010
Acoustics. Field measurements of airborne and impact sound insulation and of service equipment sound. Survey method
$92.964
BS EN ISO 10052:2004
Published Date: 01/06/2005
Acoustics. Field measurements of airborne and impact sound insulation and of service equipment sound. Survey method
$54.102
BS EN ISO 10052:2021
Published Date: 07/29/2021
Acoustics. Field measurements of airborne and impact sound insulation and of service equipment sound. Survey method
$92.964