Alternative Project Delivery System Works for Pine Hills Water Plant

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
In early 1992 the Orlando Utilities Commission (OUC) launched an ambitious water plant capital construction project to upgrade and expand its ten water plants. OUC realized that the traditional lump sum, low bid, fight-it-out-at-the-end approach to contracting would not meet its schedule or budgetary goals. As part of the preliminary design work at the Pine Hills Water Plant, OUC and Black & Veatch developed an alternative project delivery system that made the General Contractor a vital member of the project team. OUC followed CCNA procedures in selecting a construction manager/general contractor (CM/GC) for the Pine Hills work. A fee was negotiated with the selected contractor for overall construction management. The job was subdivided into 27 bid packages that were competitively bid. The CM/GC submitted a guaranteed maximum price (GMP) based on the bids received. Critical items of equipment (pumps, motor, and electrical gear) and material (pipe and valves) were procured by OUC directly and furnished to the CM/GC for installation. Once selected, the CM/GC became an integral part of the design team and made several value engineering and constructability suggestions during the design and procurement phase of the project. The three-part team (OUC, Engineer, and CM/GC) continued during construction. Plant startup was in June 1994, just 22 months after Notice to Proceed on the detailed design. Change orders were minimized and no disputes arose.
File Size : 1 file
ISBN(s) : 0898678358
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 5
Published : 01/01/1995

History


Related products

AWWA ACE95143
Published Date: 01/01/1995
Performance of Elevated Tanks During Recent California Seismic Events
$7.2
AWWA ACE95141
Published Date: 01/01/1995
A Comprehensive Survey of Tank Damage in the Northridge Earthquake
$7.2
AWWA ACE95122
Published Date: 01/01/1995
Evaluation of Various Methods for Distribution System Biofilm Control
$7.2
AWWA ACE95119
Published Date: 01/01/1995
Water System Performance in the Great Hanshin (Kobe) Earthquake
$7.2

Best-Selling Products

IEC/PAS 60027-6 Ed. 1.0 en:2004
Published Date: 09/20/2004
Letter symbols to be used in electrical technology - Control technology
$12.6
IEC/PAS 60050-732 Ed. 1.0 b:2007
Published Date: 06/06/2007
International Electrotechnical Vocabulary - Part 732: Computer network technology
$61.2
IEC/PAS 60092-510 Ed. 1.0 en:2009
Published Date: 04/29/2009
Electrical installations in ships - Part 510: Special features - High-voltage shore connection systems
$89.7
IEC/PAS 60099-7 Ed. 1.0 en:2004
Published Date: 04/27/2004
Surge arresters - Part 7: Glossary of terms and definitions from IEC publications 60099-1, 60099-4, 60099-6, 61643-1, 61643-12, 61643-21, 61643-311, 61643-321, 61643-331 and 61643-341
$95.1
IEC/PAS 60191-6-18 Ed. 1.0 en:2008
Published Date: 01/22/2008
Mechanical standardization of semiconductor devices - Part 6-18: General rules for the preparation of outline drawings of surface mounted semiconductor device packages - Design guide for ball grid array (BGA)
$29.1
IEC/PAS 60191-6-19 Ed. 1.0 en:2008
Published Date: 01/22/2008
Mechanical standardization of semiconductor devices - Part 6-19: Measurement methods of package warpage at elevated temperature and the maximum permissible warpage
$32.1