AWWA ACE99514 PDF

AWWA ACE99514 PDF

Name:
AWWA ACE99514 PDF

Published Date:
01/01/1999

Status:
Active

Description:

Heel Water Storage Reservoir and Water Treatment Facility

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The demand for drinking water is expected to rise slightly in Limburg over the next few years. N.V. Waterleiding Maatschappij Limburg (WML) plans to meet that demand by offering a reliable and constant supply of drinking water by using surface water to prepare drinking water, a method as yet untried in Limburg, WML will be able to reduce the groundwater it pumps from now until the year 2000 by 30% as required by both the national and provincial authorities. This paper describes the project created to acheive this goal, called "Switch". The water treatment facility in Heel, WML's biggest surface water project, is described and how it relates to such aspects as: environmental impacts; ecology and nature; recreation; and, architecture. A description of project organization and the timetable are given.
File Size : 1 file , 160 KB
ISBN(s) : 1583210016
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 7
Published : 01/01/1999

History


Related products

AWWA ACE99305
Published Date: 01/01/1999
Preparing for the Consequences of Practicing Enhanced Coagulation and Delayed Chlorination
$7.2
AWWA ACE99335
Published Date: 01/01/1999
Statistical Models for Assessing the Technical State of Water Networks - Some European Experiences
$7.2
AWWA ACE99368
Published Date: 01/01/1999
Chlorine Dioxide: An Attractive Alternative for Algae Control in Open, Finished-Water Reservoirs
$7.2
AWWA ACE99388
Published Date: 01/01/1999
Why Organizational Change Efforts Fail: The Neglected Power of Organizational Culture
$7.2

Best-Selling Products

1A1W1S1 Archive Product 105
Published Date: 01/01/2000
Welding Inspection Handbook
1A1W1S1 Archive Product 111
Published Date: 02/01/1981
Welding Technology for the Aerospace Industry
1A1W1S1 Archive Product 115
Published Date: 01/01/2002
Structural Welding Code - Steel
1A1W1S1 Archive Product 138
Published Date: 01/01/2002
Standard Welding Procedure Specification (Swps) for Gas Tungsten Arc Welding of Carbon Steel to Austenitic Stainless Steel (M-1, P-1 or S-1 to M-8, P-8, or S-8), 18 through 10 Gauge, in the As-Welded Condition, with or without Backing
1A1W1S1 Archive Product 142
Published Date: 01/01/2001
Ventilation Guide for Weld Fume
1A1W1S1 Archive Product 167
Published Date: 08/01/2008
Structural Welding Code Steel Bundled Set A